construction of the RailsToTrails project continues with a look behind the obstructions to the FRR-TFC RoW.includes the boardwalk site at the conservation area between the cemetery and the middle school.
FRR-TFC RailsTrails 1-26-2012 PART 3 vid link:
http://youtu.be/6TyKym5wRfY
No comments:
Post a Comment